A sample is not a pretty pair. It is the sequence that locks last, materials, colour and construction before any bulk date is honest.
Buyers ask “how many days for a sample?” the same way they ask for MOQ: they want a number they can put in a spreadsheet. An honest factory cannot give that number before it has seen the last, the material set and whether new tooling is required.
That is why this page does not publish a fixed sampling calendar. Timing is confirmed per style. What we can publish is the sequence — because the sequence is what later becomes your bulk lead time.
Sampling is the period where last, materials, colour and construction are locked. A human replies to the brief within 12 working hours. After that, mill lead, tooling and revision count decide the calendar. The approved sample is the reference for bulk. Until it exists, any production date is a guess.
Mutual NDA is signed before any design discussion that needs it. Client work is not published and is not shown to another buyer as a sales reference.
| You send | We confirm |
|---|---|
| Tech pack / reference pair / mood board | A human reply within 12 working hours |
| Last source (yours or to be developed) | Whether new last/tooling is in the sample plan |
| Market and target quantity | One quotation path: trial, custom, or not yet |
| Colour / Pantone / swatch | Which materials can be pulled vs which need mill lead |
The manufacturing partner campus in Shicheng, Jiangxi covers 473 mu (about 78 acres) with 480,000 m2 of floor space, 16 intelligent production lines and 68 smart stitching lines. Sampling uses the same construction language as bulk. That is the point: the pair you approve should be makeable on the line that will later run the order.
| Stage | What gets locked | What moves the calendar |
|---|---|---|
| Brief | Category, market, last source | Missing tech pack or unclear colour |
| Material pull | Upper, midsole, outsole, trims | Special compounds, mill lead |
| First sample | Fit + construction on a complete pair | New last or new mould |
| Revision | Colour, fit, stitch, bottoming | How many changes land at once |
| Freeze | The pair bulk will be measured against | Buyer sign-off speed |
An approved sample is a freeze: last, materials, colour and construction. After that freeze, bulk lead time can be confirmed. Before that freeze, a factory quoting a shipping week is selling you a calendar, not a shoe.
Related reading: sample to shipment, ready stock vs custom, OEM vs ODM vs private label, and how to verify the plant before you pay anyone, including us.

Sampling is where a made to order shoes programme is won or lost. Ask any vendor the same three things before you send a tech pack: what the first sample costs, how many revision rounds are included, and who signs off on the last. Buyers comparing clothing and shoe vendors should note one asymmetry — shoes made to order usually means the last is yours, and apparel has no equivalent. That is why a second revision round is normal on footwear and rare on garments.
A human replies within 12 working hours. Sampling time is confirmed per style after we see the last, the material set and the revision risk.